Project location: Saudi Arabia ship
Date: Starting from August 2024
Project background:
During the maintenance period of the ship's shore, it is necessary to install double reverse osmosis seawater desalination equipment to meet the service needs of domestic water and equipment water on board.
Customized split design of equipment based on the size of the cabin inlet and outlet in the early stage.
After entering the cabin, assemble and debug the equipment.
Project scale: 30 tons/day (1250L/hr)
More equipment details:30TPD Double RO Seawater Desalination System